Risk-based project management: the extension of the M14 line on the Paris Metro ahead of the Olympic Games


Default speaker image

AGRO CONCEPT

Director of Project Management, RATP

Seminar Business life | Friday November 21, 2025 - 9h00 - 11h00

The M14 line, the first fully automated line on the Paris Metro, was inaugurated in 1998 and ranks among the most efficient in the world, with a train every 85 seconds during peak hours whilst meeting the highest safety standards. How can the first extension to Mairie de Saint-Ouen and a second to Orly be managed before the 2024 Olympic Games, whilst the line must continue to operate on a day-to-day basis? How can a line equipped with a computerised automatic control system dating from the 1990s be extended in 2020? How can unforeseen events be managed in a project of this scale, such as the flooding of a station under construction, which, through a domino effect, threatened another line? How can risk-based management, forward planning and technical expertise in infrastructure and interfaces help to overcome difficulties and unforeseen events without exceeding the announced costs and deadlines? A brief history of a major infrastructure project, used by 1 million passengers every day.

Inside RATP

The entire article was written by:

Yann VERDO

This session was published in issue n°176 of the Journal de l'École de Paris du management, entitled Prodigieuses gestions de crise.

Google Analytics cookies
This site uses cookies from Google Analytics, these cookies help us to identify the content that interests you the most and to identify certain malfunctions. Your navigational data on this site is sent to Google Inc.